Dyness BF100-C100 is a complete outdoor air-cooled DC battery cabinet for commercial and industrial storage projects. The exact C100 configuration combines seven 280 Ah LFP packs with the control, thermal-management and cabinet safety systems required for 100 kWh nominal storage.

What the cabinet includes

The cabinet includes seven battery packs, a BDU with integrated BMS and EMS, air conditioning, touch display, internal switching and protection, multi-sensor detection, water-ingress detection, aerosol fire suppression and explosion-proof ventilation. It is a DC battery system: a compatible hybrid inverter or PCS that provides AC conversion is selected separately, together with external protection, cabling, foundation, grid studies, installation and commissioning.

Current BF100-C100 data

  • Battery chemistry and capacity: LiFePO4, 280 Ah, 100 kWh nominal
  • Pack configuration: seven 1P16S packs
  • DC voltage range: 324.8 to 403.2 V
  • Rated / maximum current: 140 / 160 A
  • Depth of discharge: 95%
  • Current datasheet dimensions: 725 x 1200 x 2260 mm
  • Current datasheet weight: 1200 +/- 100 kg
  • Ingress protection: IP55; corrosion class C3, optional C4
  • Operating temperature: -20 to 50 C, with derating above 45 C
  • Air conditioning: 2 kW cooling and 1 kW heating
  • Noise: up to 65 dB; maximum elevation 3000 m with derating above 2000 m
  • Communication: Ethernet, 4G and RS485
  • Current listed inverter families: Solis, SOSEN, SOLINTEG and Megarevo; exact model and firmware must be approved

Performance and documentation

The current datasheet lists at least 8000 cycles / 10 years at 0.2C charge and discharge, 25 C and 95% DOD. This is a defined performance reference, not a standalone warranty promise. CE, LVD and UN38.3 are listed by the manufacturer; the exact project document set, cabinet nameplate and battery revision are confirmed before acceptance.

Outdoor siting, freight and commissioning

The approximately 1.2-tonne cabinet requires a professionally designed, drained and flood-aware foundation, sufficient load capacity, required fire clearances, ventilation and service access. The manual recommends raising the cabinet about 300-500 mm above ground and keeping it away from residential areas because of operating noise. Crane or suitable forklift handling, unloading, final freight, inverter/PCS selection, protection, grid approval and commissioning are quoted for the site. Do not treat this as consumer plug-and-play equipment.

and . Browse complete battery systems.